Full Turnkey MT Package

Pennsylvania State Police Academy Marquee Building

ALL PROJECTS
300
CLT Panels
Gross Area
102,000 Sq. Ft.
Role Scope
Full Turnkey MT Package
Location
Hershey, PA
Solution Type
Mass Timber
Project Type
Infrastructure
Delivered
2025
10,000 coordinated & pre-drilled holes during manufacturing to work steel nelson studs. 30 days to install 300 panels. Averaged 10 a day - 1 panel size was as big as 8 ft wide by 47.5 ft long
Mass timber meets steel in a one-of-a-kind landmark

The Pennsylvania State Police Academy is undergoing a multi-phase campus redevelopment in Hershey, PA, highlighted by a new 102,000-square-foot marquee building overlooking Hersheypark Drive. Quality Buildings provided mass timber supply and installation services, along with specialty structural engineering for the project’s cross-laminated timber (CLT) scope. The structure incorporates more than 300 unique CLT decking panels, each individually fabricated and precisely coordinated with over 10,000 steel Nelson studs connecting the timber system with the building’s structural steel. Through detailed engineering, prefabrication, and installation coordination, QB helped streamline the integration of these complex structural systems while maintaining the precision required for a project of this scale. The PA State Police Academy showcases QB’s ability to deliver highly coordinated mass timber solutions from engineering and supply through field installation.

Up Next

CoStar Office Building

Up Next

CoStar Office Building

Next Project