FOR MASS TIMBER MANUFACTURERS

Mass Timber Installation That Protects Your Product,
and Your Reputation.

Your manufacturing precision deserves an installation partner that carries it through the field. QB combines specialized mass timber crews, BIM/VDC coordination, planned logistics, and installation sequencing to protect product quality from delivery through final connection. Your product. Our Installation Precision.

From Factory Floor
to Field Precision.

Manufacturing precision shouldn't end at delivery. QB extends that precision into field installation with coordinated logistics, experienced mass timber crews, connection expertise, and BIM-driven erection planning.

Specialized crew at workSpecialized crew at workSpecialized crew at workSpecialized crew at work

01

Product Handling & Protection

Mass timber is a finished product the moment it leaves your facility. Our crews are trained in specific rigging and hoisting techniques that prioritize surface protection, edge integrity, and moisture management, ensuring the product remains in "as-manufactured" condition.

Mass timber is a finished product the moment it leaves your facility. Our crews are trained in specific rigging and hoisting techniques that prioritize surface protection, edge integrity, and moisture management, ensuring the product remains in "as-manufactured" condition.

Specialized crew at work

02

Connection & Assembly Expertise

We understand that the strength of a timber structure lies in its connections. Our teams are experts in the tight tolerances required for specialized steel-to-timber connectors and hidden fasteners, executing every detail according to the exact digital model specifications.

We understand that the strength of a timber structure lies in its connections. Our teams are experts in the tight tolerances required for specialized steel-to-timber connectors and hidden fasteners, executing every detail according to the exact digital model specifications.

Specialized crew at work

03

Strategic 4D Execution

Field delivery is the ultimate test of off-site manufacturing. We synchronize our installation flow with your production and delivery schedule, using BIM-coordinated sequencing to reduce site-handling time and eliminate field modifications.

Field delivery is the ultimate test of off-site manufacturing. We synchronize our installation flow with your production and delivery schedule, using BIM-coordinated sequencing to reduce site-handling time and eliminate field modifications.

Specialized crew at work

Shop Drawings
to Field Execution

Your fabrication drawings drive our installation model. Every connection, tolerance, and erection sequence is resolved digitally before a single panel is lifted. BIM coordination, clash detection, and sequencing planning ensure what you manufactured is what gets built. Fewer field modifications and improvised connections.

Illustration of a pedestrian bridge with steel beams and adjacent walkways, set against a plain background.
A construction worker stands on a partially built covered bridge over snowy train tracks.

Digital Construction.

A construction worker stands on a partially built covered bridge over snowy train tracks.Illustration of a pedestrian bridge with steel beams and adjacent walkways, set against a plain background.

As Built.

Digital Construction.

What Should a Mass Timber ManufacturerExpect From an Installation Partner?

A mass timber installation partner should protect finished material, coordinate directly from fabrication information, plan site logistics and erection sequencing, understand engineered connections, and maintain clear accountability through installation.

Quality Buildings

Fragmented Field Approach

PANEL HANDLING

Chain contact, edge crushing, forklift scarring.

COORDINATION

Disconnected from your fabrication specs.

SITE LOGISTICS

Panels staged for weeks, weather exposure, re-handling.

INSTALLATION

No familiarity with your connection protocols, sequencing errors, costly field rework.

ACCOUNTABILITY

Split across engineer, BIM consultant, erector, and GC.

PANEL HANDLING

SITE LOGISTICS

INSTALLATION

ACCOUNTABILITY

Quality Buildings

Spreader beams, nylon slings, engineered lift points.

Just-in-time delivery synced to your production schedule.

Crews trained on your connection protocols and erection sequencing.

Controlled manufacturing.

Shifting structural framing to a factory floor removes high-risk work at heights.

Fragmented Field Approach

Chain contact, edge crushing, forklift scarring.

Panels staged for weeks, weather exposure, re-handling.

No familiarity with your connection protocols, sequencing errors, costly field rework.

Elevated risk profiles.

Continuous manual framing at heights under unpredictable weather and field conditions.