Workers are on the roof of a multi-story wooden building under construction.
QB PREFAB FRAMING

Prefab Framing
Engineered for How It Gets Built.

QB brings engineering, BIM coordination, prefabrication, supply, logistics, and field installation together in one accountable framing solution—helping project teams build faster with fewer field surprises.

More Than Wall Panels. A Complete Framing System

•1.5 million square feet of prefabricated wall panels installed annually across urban infill, affordable housing, student housing, and complex mixed use projects.

20-30% Faster Framing Durations

•40-60% Reduction in Framing waste

Framing is on the Critical Path. Plan it that way.


Specialized crew at workSpecialized crew at workSpecialized crew at workSpecialized crew at work

01

What Is Prefabricated & Panelized Framing?

Prefab framing replaces traditional stick building—with its on-site cutting, weather delays, heavy labor, and material waste—with precision CNC technology and MiTek digital modeling, so every component is built to exact tolerances before it leaves the factory. The result is a level of quality and precision that on-site stick framing can't match.

Panelized construction is the delivery format that makes this possible: structural framing organized into ready-to-install wall, floor, and roof sections rather than individual studs. These precision-cut "building blocks" enable rapid, "Lego-style" assembly on-site, reducing framing waste by 40–60% and accelerating schedules by up to 30%. Prefab delivers the most value when design, supply, and installation are aligned early

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Specialized crew at work

02

Why Quality Buildings?

The QB Advantage is that the QB Framing System delivers predictability where it matters most. We minimize field execution risk by acting as an integrated, technical installation partner rather than a traditional framing crew. Our team manages the entire process, from early BIM-to-factory digital coordination to precise crane sequencing and just-in-time logistics. Ensuring prefabricated systems are assembled with absolute structural integrity, speed, and schedule certainty.

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Specialized crew at work

03

What is The QB Framing System?

One coordinated package from walls through roof.
QB Prefab Framing integrates the structural components that have to work together in the field—not simply the components that are convenient to fabricate.

Panelized Wall Systems
Engineered wall panels fabricated in controlled conditions and delivered in installation sequence for faster, more consistent field erection.

Floor Systems
Open-web floor trusses, TJI or dimensional systems selected around structural requirements, spans, constructability and MEP coordination.

Roof Framing
Engineered trusses, conventional rafters or hybrid systems coordinated to project geometry, loading and installation requirements.

Shearwalls + Structural Hardware
Lateral systems, connections and hardware coordinated with the framing package before fabrication and installation.

Hybrid + Mass Timber Integration
Wood framing can be integrated with steel, concrete and mass timber systems—including CLT and glulam—so the right structural solution can be used where it creates the most value.

QB Timber Towers™
Prefabricated mass timber stair and elevator cores can be incorporated into the framing strategy to accelerate core construction and simplify coordination.

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Specialized crew at work

The Advantageof QB Prefab

Traditional stick framing invites uncontrollable waste, drifting schedules, and the headache of coordinating endless trades. QB’s prefab framing eliminates the chaos, bringing precision, predictability, and streamlined efficiency back to your job site.

More exposure to risks.

Manual cuts and field errors cause more waste, more risk of rework, and more risk to the design intent.

Strictly sequential timeline.

Framing is stuck in a linear bottleneck; crews cannot start until site prep is 100% complete.

High jobsite density.

Multiple overlapping crews increase logistical bottlenecks and scheduling complexity.

Less Constency, more gaps

Gaps between trades, more RFIs, longer punch lists and more risk to design intent.

Elevated risk profiles.

Continuous manual framing at heights under unpredictable weather and field conditions.

HEADER 1

HEADER 2

HEADER 5

QB Model
Risk Control

Reduced weather exposure, reduced RFIs, less material waste up to 60%, reduced labor volatility, safer jobsites, and protected design intent

Factory fabrication runs at the same time as site prep, shrinking total project duration by up to 30%. This means earlier dry-in, and more cost continuity from design through install

Controlled manufacturing.

Shifting structural framing to a factory floor removes high-risk work at heights.

Traditional Stick Framing
More exposure to risks.

Manual cuts and field errors cause more waste, more risk of rework, and more risk to the design intent.

Strictly sequential timeline.

Framing is stuck in a linear bottleneck; crews cannot start until site prep is 100% complete.

High jobsite density.

Multiple overlapping crews increase logistical bottlenecks and scheduling complexity.

Elevated risk profiles.

Continuous manual framing at heights under unpredictable weather and field conditions.

The Right System. In the Right Place.

Prefab framing can work alongside Mass Timber, steel, concrete, and Timber Towers™— giving project teams the flexibility to optimize the structure around cost, schedule, constructability, and design intent.

Specialized crew at workSpecialized crew at workSpecialized crew at workSpecialized crew at work

01

Hybrid Prefab Light Framed Panels & Mass Timber

A hybrid mass timber–light frame system combines mass timber components, such as CLT floors, roofs, or cores, with prefabricated light wood-frame wall panels. This approach uses mass timber where its strength, spanning capability, and exposed aesthetic provide the most value, while light-frame panels offer an efficient and economical solution for walls and other portions of the building. Successful projects depend on early coordination of connections, load paths, tolerances, MEP systems, and installation sequencing so both systems work together efficiently.

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Specialized crew at work

02

QB Timber Towers

CLT elevator and stair towers that make multi-story construction faster and safer. Craned into place as part of the framing package, they're erected in hours instead of the weeks masonry requires—reducing manpower, inspections, and weather delays while meeting ISO 834 and IBC fire-resistance standards for a streamlined schedule and real cost savings.

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Specialized crew at work

From the QB Shop to the Jobsite: QB Framing Systems provide predictable outcomes.

Take a look around our shop to see how QB manufactures with precision to a level of quality difficult to replicate in the field.

Proven at Scale

A 15-year track record: 100+ mass timber projects and 1M+ square feet delivered.

Structural projects

100+

Completed

Structures Installed

1.5M+

Sq Ft of Prefab Framing

Specialized Structural Delivery

15+

Years

A basket of fresh apples sits on a wooden table.

Multi-Family

The Harrison at Ellis Preserve

VIEW PROJECT

A basket of fresh apples sits on a wooden table.

Multi-Family

JMB Gardens Affordable Housing

VIEW PROJECT

A basket of fresh apples sits on a wooden table.

Mixed-Use / Commercial

Veterans Grove at VOPA

VIEW PROJECT

A basket of fresh apples sits on a wooden table.

Senior Living

Garden Spot Village

VIEW PROJECT

From Digital Model to Built Structure

What is drawn is what gets built. Our digital construction modeling acts as the bridge between your design intent and field reality. No coordination gaps. No field surprises.

3D model of a translucent multi-story building structure with floors and support beams visible.
Four-story residential building with balconies, outdoor seating areas, and curved walkways in green lawn.

Digital Construction.

Four-story residential building with balconies, outdoor seating areas, and curved walkways in green lawn.3D model of a translucent multi-story building structure with floors and support beams visible.

As Built.

Digital Construction.

Construction workers installing a wooden roof on a multi-story building under cloudy skies.

Simplify Your Structural Scope

You can also reach us directly by calling
717-288-2348.

Constructability Review is a low-risk entry point. We’ll analyze your current design, identify structural optimizations, and provide a roadmap from concept to code-compliant structure.
Construction workers installing a wooden roof on a multi-story building under cloudy skies.
For Framing Projects: Evan Rineer
For Mass Timber Projects: Scott Charney
For Structural Engineering Projects: Mason Brandt

FAQs

Commercial Wood Framing and Pre-Fab Construction

Commercial Mass Timber Construction

What is Commercial Wood Framing and how does it benefit my construction project?

Commercial Wood Framing involves using timber as a primary material to construct commercial buildings like multi-family apartments, hotels, and senior living facilities. It offers several advantages including cost efficiency, sustainability, and speed. By choosing wood framing, projects can save on material costs while maintaining structural integrity. Additionally, wood is a renewable resource, contributing to Sustainable Building practices. At Quality Buildings, we specialize in providing high-quality wood framing solutions that are both efficient and reliable and are experts in commercial lumber framing, specializing in multi-use communities, multi-family apartment complexes, senior living facilities, and hotel construction.

How does Pre-Fab Construction improve project timelines by up to 30%?

Pre-Fab Construction accelerates project timelines by fabricating major components off-site in a controlled environment. This minimizes on-site construction time and reduces weather-related delays. Quality Buildings uses this process to ensure that wall panels and trusses are ready for quick assembly upon arrival at the construction site. Through meticulous planning and execution, Pre-Fab Construction can cut project durations by as much as 30%, allowing developers to achieve faster return on investment and maintain tighter control over project timelines.

What sustainability benefits does Pre-Fab Construction offer?

Prefabricated Wall Panels and trusses significantly reduce material waste, noise, air pollution, and transportation emissions. Quality Buildings’ process is designed to be energy-efficient, potentially reducing CO2 emissions by 21 million tons. Our approach to wood framing construction is aligned with green building practices, helping you achieve sustainability goals while maintaining efficiency in construction. For info about passive house and sustainable design, check out this article.

How does the current lumber market and labor volatility affect framing costs and project planning?

The lumber market’s volatility has made it crucial to time the awarding of framing packages effectively. Labor pools are shrinking with less framing crews available. With prices fluctuating, and labor hard to come by, Quality Buildings advises securing framing packages early, ideally six months before mobilizing crews, to lock in better lumber pricing and mitigate budget risks. This foresight ensures that projects remain on budget and on schedule despite market uncertainties. More on Procurement here. Learn how we use digital construction to mitigate tariff concerns when planning for a mass timber projects using our design assist services check out this article.

What is included in Quality Buildings' turnkey framing package?

Our turnkey package includes everything from conventional or mass timber lumber packages to prefabricated wall panels, roof and floor trusses, and QB Timber Towers for stairs and elevator shafts. We provide on-site installation with all necessary manpower and equipment, along with safety railings. This comprehensive approach ensures that all aspects of your wood framing construction are handled efficiently and professionally. Our Turnkey Framing Package includes:

  • Conventional Lumber or Mass Timber Lumber Package
  • Pre-fabricated Wall Panels Supplied and Installed
  • Roof and Floor Trusses Supplied and Installed
  • QB TimberTowers for Stairs & Elevator Shafts
  • Delivered to the Site
  • On-site Installation that Includes Manpower & Equipment as Needed
  • Material for all Safety Railings as Needed
  • 3D BIM Modeling Using MiTek

How does Quality Buildings utilize technology in their construction process?

We leverage 3D Structural Modeling Software by MiTek to create accurate and clash-free frame outlines. This technology integrates architectural and structural drawings to identify discrepancies early, facilitating better collaboration with other trades. The result is greater time and cost efficiency throughout the project lifecycle, ensuring that every component fits seamlessly into the overall construction plan. Learn more about digital construction here.

What types of projects are best suited for Pre-Fab Construction and where does QB work?

Pre-Fab Construction is ideal for a variety of projects including multi-use communities, hotels, senior living facilities, and multi-family apartment complexes. Its adaptability also makes it well-suited for commercial, educational, municipal, and healthcare buildings. The scalability and efficiency of prefabricated solutions allow for their application across diverse project types, ensuring quality and speed in construction.

QB delivers prefab framing solutions across the Mid-Atlantic and Northeast, with a strong presence in PA, DE, MD, NJ, VA and NY

How does Early Selection of a Framing Partner benefit my project?

Selecting your framing partner early offers several advantages, including better lumber pricing and securing top vendors for crucial components like trusses. This proactive approach helps in better BIM coordination and reduces the risk of delays and budget overruns. Quality Buildings’ expertise ensures that your project is equipped with the best resources from the onset, facilitating smooth progress and successful completion.

What sets Quality Buildings apart in wood framing construction?

Quality Buildings stands out due to our commitment to efficiency, safety, and sustainability. Our award-winning approach combines advanced technology, experienced project management, and innovative prefabrication techniques. This combination ensures that we deliver high-quality construction solutions that meet the unique needs of each project while adhering to strict timelines and budgets. See some of our projects here.

Who can benefit from partnering with Quality Buildings for construction projects?

Developers, architects, builders, and general contractors looking for reliable, high-quality wood framing construction solutions will find significant value in QB Framing Systems for its certainty:

Owners & Developers benefit from cost and speed certainty:

•Reduced total project duration and carrying costs

•Earlier Dry-in, faster leasing

•Lower exposure to labor volatility and weather delays

•Reduced rework and protected proformas

General Contractors appreciate the execution & schedule certainty:

•Issues resolved and trades coordinated before install for reduced rework and field modifications

•Labor Stability, cleaner and safer jobsite

•Control over schedule means protecting critical path and margin

Architects & Engineers gain certainty in design intent:

•Built from BIM-driven shop drawings for less field interpretation

•Early structural and MEP coordination for clash detection before construction

•Code compliance and documentation for accurate shear and fire-rated systems